We have some limitations on delivering reliable and uninterrupted power supply at the customer end. Probably you will be knowing that total power required in Dhaka Palli Bidyut Samity-2 is being supplied from the Hasnabad Grid Sub-station of PGCB at present. Since this grid is located far away, sometimes we are to face some unexpected interruptions to our 33/11 KV substations during the time of thunderstorm and rough weather. We are sorry for this inconvenience of our valued customer.
However, it is noted that Nababganj-100MVA grid substation built by PGCB will be energized as soon as possible. In addition to that 05 more 33/11KV sub-stations are under construction.